Company Interiors have recently completed a two floor installation involving the reconstruction of existing partitioning, dismantled refurbishment and rebuilt to create a cost effective and upgraded installation.

The first floor was completely reconstructed with all new install and LED lighting to form a new working environment. 

The Client with a keen eye for interior design assisted with free issue of dynamic wall coverings and feature lighting for the main staircase.